Skip to search boxSkip to navigationSkip to main content

Incorporation and Design of a New Facility in a Country-wide Logistics Network.: Ricaño, Oscar E., Lozano, Héctor A., Moreno, José C., Díaz-Ramírez, J. (2020),

  • Oscar Eduardo Ricaño Carrillob(Author)
    ,
  • Lozano Vázquez Héctor Adriánb(Author)
    ,
  • José Carlos Moreno Loredob(Author)
    ,
Research Output: Contribution to journal Conference article Peer-review

Abstract

This paper proposes a location and design warehouse methodology, starting from the premise that there’s at least one existing distribution center (DC), in a manufacturing logistics network. The paper uses current methods with a new proposed integral methodology, that covers from a general diagnosis of the current state of the company, up to a simulation phase for the network redesign. This structured guide aims to simplify the way companies research for and develop their expansi3on and warehouse design projects. Furthermore, it presents a method to take qualitative factors into account while deciding on the warehouse location and suggests a simulation method that takes more than a single stock item’s behavior into account, so results could be more accurate.

Publication Information

Output type

Research Output: Contribution to journal Conference article Peer-review

Original language

English

Article number

331

Journal (Volume, Issue Number)

Proceedings of the International Conference on Industrial Engineering and Operations Management

Publication milestones

  • Accepted/In press
    - 12/2020

Publication status

Accepted/In press
- 12/2020

Access to documents

Related Event

Title

2nd African IEOM Conference in Harare, 2020 : IEOM Africa 2020

Event type

Conference

Degree of recognition

International event

Date

07/12/2020 - 10/12/2020

Location

HarareZimbabwe