Skip to search boxSkip to navigationSkip to main content

Implementing Lean Six Sigma 4.0 and Demand-Driven Material Requirements Planning for Enhanced Maintenance, Repair, and Operations Inventory Efficiency and Cost Reduction

Research Output:
Chapter in Book/Report/Conference proceeding
Chapter (peer-reviewed)
Peer-review

Abstract

The purpose of this research is to reduce the value of maintenance, repair, and operations (MRO) inventory (active and slow categories) by five percent in a mining sector organization. To achieve this aim, the research team uses an action research framework with a Lean Six Sigma (LSS) 4.0 approach and demand-driven material requirements planning (DDMRP) concepts. According to the simulations conducted in this LSS 4.0 project, the value of MRO inventory could be reduced by 51%, and the service level could improve to 88%. This project has several limitations, such as not including vital and emergency MROs, not including other operational regions with different MROs, conducting the simulation at the family level instead of the stock-keeping unit (SKU) level, and not fully implementing. Using theoretical and practitioner approaches, this paper contributes to the body of knowledge about how Industry 4.0 technologies could be used in continuous improvement projects, demonstrates the importance of inventory management in MRO, validates the importance of success factors mentioned in the literature, and offers a different approach where LSS could be combined with other methodologies, such as DDMRP.

Publication Information

Output type

Research Output:
Chapter in Book/Report/Conference proceeding
Chapter (peer-reviewed)
Peer-review

Original language

English

Publication milestones

  • Published - 2026

Publication status

Published - 2026

Chapter Number

8

Host publication title

Quality 4.0