Improving On-Time Delivery Through Better Production and Inventory Planning and Control

Resultado de la investigación

Resumen

This paper presents a description of the design and implementation of an improved planning and control raw material inventory system for a Mexican company located in Monterrey. The suggested system includes the integration of a new forecasting system and an improved updated inventory control scheme. The validation and implementation phases of the project are described. Finally, current performance results are illustrated.
Idioma originalEnglish
Páginas227-234
Número de páginas8
EstadoPublished - sep 2013
Evento2nd Annual World Conference Society Industrial and Systems Engineering: World Conference - Las Vegas, Las Vegas
Duración: 5 nov 20147 nov 2014
Número de conferencia: 2
http://toc.proceedings.com/29696webtoc.pdf

Conference

Conference2nd Annual World Conference Society Industrial and Systems Engineering
Título abreviadoSISE 2014
PaísUnited States
CiudadLas Vegas
Período5/11/147/11/14
Dirección de internet

Huella dactilar

Inventory control
Raw materials
Planning
Industry
Delivery time
Planning and control
Forecasting system
Inventory systems

All Science Journal Classification (ASJC) codes

  • Engineering(all)
  • Business, Management and Accounting(all)

Citar esto

Verduzco Garza, M. T., & Villarreal, B. (2013). Improving On-Time Delivery Through Better Production and Inventory Planning and Control. 227-234. Papel presentado en 2nd Annual World Conference Society Industrial and Systems Engineering, Las Vegas, .
Verduzco Garza, María Teresa ; Villarreal, Bernardo. / Improving On-Time Delivery Through Better Production and Inventory Planning and Control. Papel presentado en 2nd Annual World Conference Society Industrial and Systems Engineering, Las Vegas, .8 p.
@conference{9685af675884421b841598a34a2a4950,
title = "Improving On-Time Delivery Through Better Production and Inventory Planning and Control",
abstract = "This paper presents a description of the design and implementation of an improved planning and control raw material inventory system for a Mexican company located in Monterrey. The suggested system includes the integration of a new forecasting system and an improved updated inventory control scheme. The validation and implementation phases of the project are described. Finally, current performance results are illustrated.",
author = "{Verduzco Garza}, {Mar{\'i}a Teresa} and Bernardo Villarreal",
note = "ISBN: 9781510820067; 2nd Annual World Conference Society Industrial and Systems Engineering : World Conference, SISE 2014 ; Conference date: 05-11-2014 Through 07-11-2014",
year = "2013",
month = "9",
language = "English",
pages = "227--234",
url = "http://toc.proceedings.com/29696webtoc.pdf",

}

Improving On-Time Delivery Through Better Production and Inventory Planning and Control. / Verduzco Garza, María Teresa; Villarreal, Bernardo.

2013. 227-234 Papel presentado en 2nd Annual World Conference Society Industrial and Systems Engineering, Las Vegas, .

Resultado de la investigación

TY - CONF

T1 - Improving On-Time Delivery Through Better Production and Inventory Planning and Control

AU - Verduzco Garza, María Teresa

AU - Villarreal, Bernardo

N1 - ISBN: 9781510820067

PY - 2013/9

Y1 - 2013/9

N2 - This paper presents a description of the design and implementation of an improved planning and control raw material inventory system for a Mexican company located in Monterrey. The suggested system includes the integration of a new forecasting system and an improved updated inventory control scheme. The validation and implementation phases of the project are described. Finally, current performance results are illustrated.

AB - This paper presents a description of the design and implementation of an improved planning and control raw material inventory system for a Mexican company located in Monterrey. The suggested system includes the integration of a new forecasting system and an improved updated inventory control scheme. The validation and implementation phases of the project are described. Finally, current performance results are illustrated.

UR - http://toc.proceedings.com/29696webtoc.pdf

M3 - Paper

SP - 227

EP - 234

ER -

Verduzco Garza MT, Villarreal B. Improving On-Time Delivery Through Better Production and Inventory Planning and Control. 2013. Papel presentado en 2nd Annual World Conference Society Industrial and Systems Engineering, Las Vegas, .