Achieving competitiveness through setup time reduction

Minerva Mayela Orta-Lozano, Bernardo Villarreal

Resultado de la investigación

3 Citas (Scopus)

Resumen

This paper has the purpose of describing the efforts of a Mexican company with several galvanizing lines, located in Monterrey, Mexico, to diminish setup time. The firm's operations strategy requires a better performance of the plant in terms of line capacity utilization, more productivity and quicker response to market's orders. The setup reduction project set to obtain those goals was organized to attack two fronts; The reduction of the time per setup, and the decrease of the number of setups.

Idioma originalEnglish
Título de la publicación alojadaIEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding
EditorialInstitute of Electrical and Electronics Engineers Inc.
ISBN (versión digital)9781479960651
ISBN (versión impresa)9781479960651
DOI
EstadoPublished - 23 abr. 2015
EventoIEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding -
Duración: 1 ene. 2015 → …

Serie de la publicación

NombreIEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding

Conference

ConferenceIEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding
Período1/1/15 → …

All Science Journal Classification (ASJC) codes

  • Ingeniería industrial y de fabricación
  • Ciencia de la gestión e investigación de operaciones

Huella

Profundice en los temas de investigación de 'Achieving competitiveness through setup time reduction'. En conjunto forman una huella única.

Citar esto