Modelo de programación de la producción por lotes de múltiples productos con tiempo continuo

Jenny Díaz-Ramírez, José Ignacio Huertas

Research output: Contribution to journalArticlepeer-review

5 Citations (Scopus)

Abstract

In the chemical industry, it is common to find production systems characterized by having a single stage or a previously identified bottleneck stage, with multiple non-identical parallel stations and with setup costs that depend on the production sequence. This paper proposes a mixed integer production-scheduling model that identifies lot size and product sequence that maximize profit. It considers multiple typical industry conditions, such as penalties for noncompliance or out of service periods of the productive units (or stations) for preventive maintenance activities. The model was validated with real data from an oil chemical company. Aiming to analyze its performance, we applied the model to 155 instances of production, which were obtained using Monte Carlo technique on the historical production data of the same company. We obtained an average 12 % reduction in the total cost of production and a 19 % increase in the estimated profit.

Original languageSpanish
Pages (from-to)96-104
Number of pages9
JournalIngenieria e Investigacion
Volume38
Issue number1
DOIs
Publication statusPublished - Apr 2018

Bibliographical note

Publisher Copyright:
© 2018, Revista Ingenieria e Investigacion - Editorial Board. All rights reserved.

All Science Journal Classification (ASJC) codes

  • General Engineering

Fingerprint

Dive into the research topics of 'Modelo de programación de la producción por lotes de múltiples productos con tiempo continuo'. Together they form a unique fingerprint.

Cite this