Abstract
This paper presents a description of the design and implementation of an improved planning and control raw material inventory system for a Mexican company located in Monterrey. The suggested system includes the integration of a new forecasting system and an improved updated inventory control scheme. The validation and implementation phases of the project are described. Finally, current performance results are illustrated.
Original language | English |
---|---|
Pages | 227-234 |
Number of pages | 8 |
Publication status | Published - Sept 2013 |
Event | 2nd Annual World Conference Society Industrial and Systems Engineering: World Conference - Las Vegas, Las Vegas, United States Duration: 5 Nov 2014 → 7 Nov 2014 Conference number: 2 http://toc.proceedings.com/29696webtoc.pdf |
Conference
Conference | 2nd Annual World Conference Society Industrial and Systems Engineering |
---|---|
Abbreviated title | SISE 2014 |
Country/Territory | United States |
City | Las Vegas |
Period | 5/11/14 → 7/11/14 |
Internet address |
Bibliographical note
ISBN: 9781510820067All Science Journal Classification (ASJC) codes
- General Engineering
- General Business,Management and Accounting