Achieving competitiveness through setup time reduction

Minerva Mayela Orta-Lozano, Bernardo Villarreal

Research output: Chapter in Book/Report/Conference proceedingConference contribution

2 Citations (Scopus)

Abstract

This paper has the purpose of describing the efforts of a Mexican company with several galvanizing lines, located in Monterrey, Mexico, to diminish setup time. The firm's operations strategy requires a better performance of the plant in terms of line capacity utilization, more productivity and quicker response to market's orders. The setup reduction project set to obtain those goals was organized to attack two fronts; The reduction of the time per setup, and the decrease of the number of setups.

Original languageEnglish
Title of host publicationInternational Conference on Industrial Engineering and Operations Management
PublisherInstitute of Electrical and Electronics Engineers Inc.
DOIs
Publication statusPublished - 23 Apr 2015
EventIEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding -
Duration: 1 Jan 2015 → …

Conference

ConferenceIEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding
Period1/1/15 → …

All Science Journal Classification (ASJC) codes

  • Industrial and Manufacturing Engineering
  • Management Science and Operations Research

Cite this

Orta-Lozano, M. M., & Villarreal, B. (2015). Achieving competitiveness through setup time reduction. In International Conference on Industrial Engineering and Operations Management Institute of Electrical and Electronics Engineers Inc.. https://doi.org/10.1109/IEOM.2015.7093894
Orta-Lozano, Minerva Mayela ; Villarreal, Bernardo. / Achieving competitiveness through setup time reduction. International Conference on Industrial Engineering and Operations Management. Institute of Electrical and Electronics Engineers Inc., 2015.
@inproceedings{d9698976093647838f92450419214096,
title = "Achieving competitiveness through setup time reduction",
abstract = "This paper has the purpose of describing the efforts of a Mexican company with several galvanizing lines, located in Monterrey, Mexico, to diminish setup time. The firm's operations strategy requires a better performance of the plant in terms of line capacity utilization, more productivity and quicker response to market's orders. The setup reduction project set to obtain those goals was organized to attack two fronts; The reduction of the time per setup, and the decrease of the number of setups.",
author = "Orta-Lozano, {Minerva Mayela} and Bernardo Villarreal",
year = "2015",
month = "4",
day = "23",
doi = "10.1109/IEOM.2015.7093894",
language = "English",
booktitle = "International Conference on Industrial Engineering and Operations Management",
publisher = "Institute of Electrical and Electronics Engineers Inc.",
address = "United States",

}

Orta-Lozano, MM & Villarreal, B 2015, Achieving competitiveness through setup time reduction. in International Conference on Industrial Engineering and Operations Management. Institute of Electrical and Electronics Engineers Inc., IEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding, 1/1/15. https://doi.org/10.1109/IEOM.2015.7093894

Achieving competitiveness through setup time reduction. / Orta-Lozano, Minerva Mayela; Villarreal, Bernardo.

International Conference on Industrial Engineering and Operations Management. Institute of Electrical and Electronics Engineers Inc., 2015.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

TY - GEN

T1 - Achieving competitiveness through setup time reduction

AU - Orta-Lozano, Minerva Mayela

AU - Villarreal, Bernardo

PY - 2015/4/23

Y1 - 2015/4/23

N2 - This paper has the purpose of describing the efforts of a Mexican company with several galvanizing lines, located in Monterrey, Mexico, to diminish setup time. The firm's operations strategy requires a better performance of the plant in terms of line capacity utilization, more productivity and quicker response to market's orders. The setup reduction project set to obtain those goals was organized to attack two fronts; The reduction of the time per setup, and the decrease of the number of setups.

AB - This paper has the purpose of describing the efforts of a Mexican company with several galvanizing lines, located in Monterrey, Mexico, to diminish setup time. The firm's operations strategy requires a better performance of the plant in terms of line capacity utilization, more productivity and quicker response to market's orders. The setup reduction project set to obtain those goals was organized to attack two fronts; The reduction of the time per setup, and the decrease of the number of setups.

UR - http://www.scopus.com/inward/record.url?scp=84931064270&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84931064270&partnerID=8YFLogxK

U2 - 10.1109/IEOM.2015.7093894

DO - 10.1109/IEOM.2015.7093894

M3 - Conference contribution

BT - International Conference on Industrial Engineering and Operations Management

PB - Institute of Electrical and Electronics Engineers Inc.

ER -

Orta-Lozano MM, Villarreal B. Achieving competitiveness through setup time reduction. In International Conference on Industrial Engineering and Operations Management. Institute of Electrical and Electronics Engineers Inc. 2015 https://doi.org/10.1109/IEOM.2015.7093894