A continuous improvement project to increase the fulfillment level in a wire and cable company

Mitzary Elizabeth Chavero Hidalgo, Yaneth Alejandra Santos Muñiz, Alan Javier Corral De León, Fernando González Aleu, Jesus Vazquez, Teresa Verduzco-Garza, Jose A. Lozano

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

A continuous improvement project (CIP) is a structured project using a team of people during a relative short period of time to improve a work area or process metric. An international wire and cable company had 51% orders delayed, which affected the fulfillment level of on-time orders, placing it on monthly average of 88%. The purpose of this project is to improve the fulfillment level indicator. In order to achieve this paper's goal, the research team used a Plan-Do-Check-Act (PDCA) problem solving methodology to address the main and action research methodology to document the results of this paper. Although this CIP is ongoing, after one week of implementing a pilot test in information transparency, the fulfillment level increased 3.5%. The content of this paper is relevant for professionals in the field because it shows the process of applying a continuous improvement methodology in the analysis, design and implementation of a solution to a very common issue for many companies. The benchmarking that the team made showed that other companies solved the problem by centralizing information, which was the option selected as "core" of the project. Despite the company's willingness to cooperate with the CIP, a key limitation was present: the lack of unified information.

Original languageEnglish
Title of host publicationProceedings of the International Conference on Industrial Engineering and Operations Management
PublisherIEOM Society
Pages456-468
Number of pages13
Publication statusPublished - Apr 2017
EventProceedings of the International Conference on Industrial Engineering and Operations Management -
Duration: 1 Jan 2017 → …

Conference

ConferenceProceedings of the International Conference on Industrial Engineering and Operations Management
Period1/1/17 → …

Fingerprint

Cables
Wire
Industry
Benchmarking
Transparency
Cable
Continuous improvement
Methodology

All Science Journal Classification (ASJC) codes

  • Strategy and Management
  • Management Science and Operations Research
  • Control and Systems Engineering
  • Industrial and Manufacturing Engineering

Cite this

Hidalgo, M. E. C., Muñiz, Y. A. S., De León, A. J. C., Aleu, F. G., Vazquez, J., Verduzco-Garza, T., & Lozano, J. A. (2017). A continuous improvement project to increase the fulfillment level in a wire and cable company. In Proceedings of the International Conference on Industrial Engineering and Operations Management (pp. 456-468). IEOM Society.
Hidalgo, Mitzary Elizabeth Chavero ; Muñiz, Yaneth Alejandra Santos ; De León, Alan Javier Corral ; Aleu, Fernando González ; Vazquez, Jesus ; Verduzco-Garza, Teresa ; Lozano, Jose A. / A continuous improvement project to increase the fulfillment level in a wire and cable company. Proceedings of the International Conference on Industrial Engineering and Operations Management. IEOM Society, 2017. pp. 456-468
@inproceedings{8ad29cd0e4fd42308e8118ff15542b58,
title = "A continuous improvement project to increase the fulfillment level in a wire and cable company",
abstract = "A continuous improvement project (CIP) is a structured project using a team of people during a relative short period of time to improve a work area or process metric. An international wire and cable company had 51{\%} orders delayed, which affected the fulfillment level of on-time orders, placing it on monthly average of 88{\%}. The purpose of this project is to improve the fulfillment level indicator. In order to achieve this paper's goal, the research team used a Plan-Do-Check-Act (PDCA) problem solving methodology to address the main and action research methodology to document the results of this paper. Although this CIP is ongoing, after one week of implementing a pilot test in information transparency, the fulfillment level increased 3.5{\%}. The content of this paper is relevant for professionals in the field because it shows the process of applying a continuous improvement methodology in the analysis, design and implementation of a solution to a very common issue for many companies. The benchmarking that the team made showed that other companies solved the problem by centralizing information, which was the option selected as {"}core{"} of the project. Despite the company's willingness to cooperate with the CIP, a key limitation was present: the lack of unified information.",
author = "Hidalgo, {Mitzary Elizabeth Chavero} and Mu{\~n}iz, {Yaneth Alejandra Santos} and {De Le{\'o}n}, {Alan Javier Corral} and Aleu, {Fernando Gonz{\'a}lez} and Jesus Vazquez and Teresa Verduzco-Garza and Lozano, {Jose A.}",
year = "2017",
month = "4",
language = "English",
pages = "456--468",
booktitle = "Proceedings of the International Conference on Industrial Engineering and Operations Management",
publisher = "IEOM Society",

}

Hidalgo, MEC, Muñiz, YAS, De León, AJC, Aleu, FG, Vazquez, J, Verduzco-Garza, T & Lozano, JA 2017, A continuous improvement project to increase the fulfillment level in a wire and cable company. in Proceedings of the International Conference on Industrial Engineering and Operations Management. IEOM Society, pp. 456-468, Proceedings of the International Conference on Industrial Engineering and Operations Management, 1/1/17.

A continuous improvement project to increase the fulfillment level in a wire and cable company. / Hidalgo, Mitzary Elizabeth Chavero; Muñiz, Yaneth Alejandra Santos; De León, Alan Javier Corral; Aleu, Fernando González; Vazquez, Jesus; Verduzco-Garza, Teresa; Lozano, Jose A.

Proceedings of the International Conference on Industrial Engineering and Operations Management. IEOM Society, 2017. p. 456-468.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

TY - GEN

T1 - A continuous improvement project to increase the fulfillment level in a wire and cable company

AU - Hidalgo, Mitzary Elizabeth Chavero

AU - Muñiz, Yaneth Alejandra Santos

AU - De León, Alan Javier Corral

AU - Aleu, Fernando González

AU - Vazquez, Jesus

AU - Verduzco-Garza, Teresa

AU - Lozano, Jose A.

PY - 2017/4

Y1 - 2017/4

N2 - A continuous improvement project (CIP) is a structured project using a team of people during a relative short period of time to improve a work area or process metric. An international wire and cable company had 51% orders delayed, which affected the fulfillment level of on-time orders, placing it on monthly average of 88%. The purpose of this project is to improve the fulfillment level indicator. In order to achieve this paper's goal, the research team used a Plan-Do-Check-Act (PDCA) problem solving methodology to address the main and action research methodology to document the results of this paper. Although this CIP is ongoing, after one week of implementing a pilot test in information transparency, the fulfillment level increased 3.5%. The content of this paper is relevant for professionals in the field because it shows the process of applying a continuous improvement methodology in the analysis, design and implementation of a solution to a very common issue for many companies. The benchmarking that the team made showed that other companies solved the problem by centralizing information, which was the option selected as "core" of the project. Despite the company's willingness to cooperate with the CIP, a key limitation was present: the lack of unified information.

AB - A continuous improvement project (CIP) is a structured project using a team of people during a relative short period of time to improve a work area or process metric. An international wire and cable company had 51% orders delayed, which affected the fulfillment level of on-time orders, placing it on monthly average of 88%. The purpose of this project is to improve the fulfillment level indicator. In order to achieve this paper's goal, the research team used a Plan-Do-Check-Act (PDCA) problem solving methodology to address the main and action research methodology to document the results of this paper. Although this CIP is ongoing, after one week of implementing a pilot test in information transparency, the fulfillment level increased 3.5%. The content of this paper is relevant for professionals in the field because it shows the process of applying a continuous improvement methodology in the analysis, design and implementation of a solution to a very common issue for many companies. The benchmarking that the team made showed that other companies solved the problem by centralizing information, which was the option selected as "core" of the project. Despite the company's willingness to cooperate with the CIP, a key limitation was present: the lack of unified information.

UR - http://www.scopus.com/inward/record.url?scp=85018991785&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85018991785&partnerID=8YFLogxK

M3 - Conference contribution

SP - 456

EP - 468

BT - Proceedings of the International Conference on Industrial Engineering and Operations Management

PB - IEOM Society

ER -

Hidalgo MEC, Muñiz YAS, De León AJC, Aleu FG, Vazquez J, Verduzco-Garza T et al. A continuous improvement project to increase the fulfillment level in a wire and cable company. In Proceedings of the International Conference on Industrial Engineering and Operations Management. IEOM Society. 2017. p. 456-468